Bresnahan School
Model School Project
Exhaustive study of the Nock Molin building has identified the following needs to be addressed: Quick Links
Nock and Molin Schools
Renovation and Improvement Project
Building Interior
-Renovate restrooms -New ceilings throughout -New flooring throughout -Reconfiguration for Special Education -Replace retractable walls between classrooms with permanent walls -Replace lockers -Replace bleachers in gym -Replace all interior door hardware -Replace/modify stairway railings
Building Envelope
-Replace 75,000 square feet of roofing -Remove and replace all windows and skylights -Remove and replace exterior doors and hardware -Repair water infiltration issues
Life Safety
-Install comprehensive fire alarm system -Install fire sprinkler system -Create "fire-rated" electrical closets for emergency lighting panels
Accessibility
-Bring interior of building into full compliance with accessibility codes -Bring walkways and grounds into full compliance with accessibility codes
Structural
-Repair cracking caused by settling in various areas throughout the building
Mechanical/Electrical Systems
-Replace HVAC system that has exceeded its life expectancy (existing system is electric heat, new system will be gas-fired boilers) -Expand energy management system to control all equipment -Replace and upgrade electrical service and panels due to age and to meet technology needs -Add electrical outlets in classrooms for technology needs -Upgrade data network backbone to meet current and future technology needs -Install more efficient lighting throughout |